The prefabricated blocks that will form the vessel are lifted into place by a crane and assembled on the slipway according to a welding sequence. After each block is lowered into position, joints are welded together. Quality control inspections are critical at this stage to ensure the proper alignment of the blocks. In total, 219 blocks will form the new ship, each weighing approximately 150 tonnes.
Recent Comments