Design and Engineering, and Equipment Selection

Based on the operational profile and requirements of the vessel, the design and engineering phase begins at the onset of the newbuild project. The ship hull form undergoes a feasibility study to determine its resistance in water. Following a model tank testing...

Shipyard Contract signing

The contract between CSL and Chengxi Shipyard for the construction of the new vessel was signed in August 2019. Once the contract signed, the shipyard assigns a hull number to the newbuild vessel for reference. In this case, the hull (the main body of steel of the...

Contract Signing

After a long-standing partnership and many years of planning, on September 18, 2019, Windsor Salt and CSL signed a long-term time charter contract on the basis of the construction of a new ship to service the Mines Seleine salt mine located on Grosse-Ile in the...